Port Execution (Anzali Port Customs)

sazekar construction company
Home Page » Project » Port Execution (Anzali Port Customs)

هدف طرح

In line with the general policy of the Ministry of Roads and Urban Development in order to reduce traffic and burden sharing from the provincial center as well as easy and quick access to the eastern part of Gilan, Siahkel as the eastern belt of Guilan province has been studied and is underway. The Big White Bridge was 700 km + 5 axis long, 300 meters long and 13.7 meters wide, and its output was approximately 1.6 km long, in the form of 25% of the contract of Sazeh-e-Kard Company, which is currently executing the operation of the Bridge of Sefidrud It is completed and the input ramp and its output piece are in progress.

مشخصات فنی طرح

      The implementation of a bridge with a length of 300 meters (12 cavities 25 meters) with a width of 13/7 meters with 72 concrete beams with a height of 1/65, 24/8 meters in length, and 29 candles with a diameter of 2.1 meters and a total length of 667 meters and 33 meters with a length of 1.5 meters and a total length of 994 meters.
     

  1. Construction of 11 technical buildings (prestigious) to a span of 2 meters with a total length of 180 meters.
     

  2. Construction of 3 technical buildings (prestigious) to a span of 3 meters with a total length of 90 meters
     

  3. Implementation of an earthquake measuring approximately 1.6 kilometers (in the form of a 25% initial agreement).